Agency: South Carolina Department of Environmental Services (SCDES) Asbestos Section (Bureau of Air Quality)
Official program page
The SCDES Asbestos Section issues asbestos permits for regulated renovation and demolition and licenses individuals who inspect, design, air-monitor, manage in place, remove, clean up, or otherwise handle regulated asbestos-containing materials.

One section for permits and licenses
SCDES says its Asbestos Section issues asbestos permits for regulated renovation and demolition and licenses individuals involved in inspection, design, air monitoring, in-place management, removal, cleanup, or other handling of regulated ACM. Source: SCDES Asbestos.
Who must be licensed
All contractors, facilities, supervisors, workers, air samplers, project designers, building inspectors, and management planners involved in those activities must be licensed by SCDES in a discipline specific to their activity. Licenses are non-transferable. Contractor licenses require a company representative with a valid SCDES supervisor license affiliated with that company. Air sampler licenses require approved supervisor or project-monitor training plus NIOSH 582 (or CIH documentation). Sources: SCDES Contractor Licensing Fees, SCDES Asbestos.
Renovations — notify before removing RACM
Before removing regulated asbestos-containing materials, an ePermitting application must be submitted to SCDES (up to 10 working days in advance, depending on the amount to be removed), with required fees. You must obtain a Department permit before the renovation activity. Source: SCDES Renovations and Demolitions. Regulation 61-86.1 also describes a four-working-day notice path for smaller renovations below NESHAP size — read the regulation for thresholds. Source: S.C. Regulation 61-86.1 (PDF).
Demolitions — notice even with no asbestos
Before demolishing any regulated facility, submit an ePermitting application at least 10 working days in advance even if a building inspector finds no asbestos. Include required fees and a copy of the building inspector’s report, and obtain a Department permit before demolition. Source: SCDES Renovations and Demolitions.
What may stay in place during demolition
SCDES states all asbestos-containing materials must be removed before demolition, with limited exceptions such as ACM encased in concrete or similarly hard material, RACM discovered only after demolition began that cannot be safely removed, and certain Category I/II nonfriable mastic/glue/adhesive ACM that is not friable or in poor condition. Source: SCDES Renovations and Demolitions.
Residential demolition exceptions
Demolition of a private residence with four or fewer units is exempt unless it is part of a larger commercial/public project, involves multiple residences in a compact area under one owner/operator, is part of an installation (for example a campus), is burned for fire training, or was used for non-residential purposes. Source: SCDES Renovations and Demolitions.
Find a licensed firm
SCDES publishes an Asbestos Contractors and Consultants Search from its Asbestos page.
Common asbestos materials checklist
EPA and state agencies list these as places asbestos may be found. Checking a box does not mean the material in your building contains asbestos — only a laboratory analysis can determine that. Use this list to brief a licensed inspector, then request a match below.
Sources: EPA — Learn About Asbestos (where asbestos may be found); EPA — Protect Your Family; Maine DEP inspection FAQ and Rhode Island homeowner asbestos page, cited on those state pages.
0 material types selected.
A licensed inspector can sample the items you care about and send them to an accredited lab. We are an educational match service, not a testing company.
Check any materials you are worried about. A short summary and match button will appear here.
Do I need asbestos testing in South Carolina?
Answer three questions. The result cites EPA’s “don’t disturb it — use a trained and accredited professional” guidance, plus this state’s official rules. It is educational, not a legal determination.
If you are planning to remodel, do not assume the work is risk-free. EPA’s homeowner guidance says remodeling can disturb building materials and that a trained and accredited asbestos professional should take samples for analysis. EPA also says taking samples yourself is not recommended, because sampling done incorrectly can be more hazardous than leaving the material alone.
Federal Asbestos NESHAP rules require a thorough inspection where demolition or renovation will occur at a facility — structures, installations, and buildings, excluding residential buildings that have four or fewer dwelling units. Any demolition or renovation at an institutional, commercial, or industrial building is regulated; at a minimum the thorough inspection requirement applies. The owner or operator must notify the delegated agency (often the state) before any demolition, and before renovations of buildings that contain a threshold amount of regulated asbestos-containing material. NESHAP does not require regulated ACM to be removed before demolition or renovation if the total amount to be removed or disturbed is less than 260 linear feet, 160 square feet, or 35 cubic feet. Houses demolished as part of a commercial or public project are not treated as exempt. Your state can be stricter than this federal floor — read the state notes below.
EPA says that if building materials in your home are not damaged and will not be disturbed, you do not need to have the home tested for asbestos. Material that is in good condition and will not be disturbed (by remodeling, for example) should be left alone.
For an owner-occupied home, start with EPA’s rule of thumb: leave undamaged material alone, and use a trained and accredited professional if you will remodel or if material is more than slightly damaged (Protect Your Family from Exposures to Asbestos). State licensing, inspection, and notification rules can still apply when a contractor does the work or when you renovate — check your state page.
Rental housing and apartments are often treated more strictly than an owner-occupied single-family home. Landlords, property managers, and contractors more often need a licensed inspector and a licensed abatement contractor. OSHA regulates asbestos in construction and general industry; Maine DEP notes that OSHA rules apply whenever an employer/employee relationship exists. Read your state’s rental and multi-unit notes on this page.
EPA’s Asbestos NESHAP page states that any demolition or renovation operation at an institutional, commercial, or industrial building is regulated, and that at a minimum the thorough inspection requirement applies. Schools have extra duties under AHERA: inspections and response actions must be done by professionals trained under EPA’s Model Accreditation Plan, and school bulk samples and TEM clearance air samples must go to a NIST NVLAP-accredited laboratory. EPA also recommends accredited labs for non-school buildings.
EPA says asbestos-containing materials that are not damaged or disturbed are not likely to pose a health risk, and that the best step is usually to leave material alone if it is in good condition. Do leave undamaged asbestos-containing materials alone, and take every precaution to avoid damaging them.
If you suspect a material contains asbestos, EPA says not to touch it. Look for signs of wear or damage such as tears, abrasions, or water damage. Damaged material may release fibers, especially if it is hit, rubbed, handled, or exposed to vibration or airflow. If the material is more than slightly damaged, or you are going to make changes that might disturb it, repair or removal by a trained and accredited asbestos professional is needed.
EPA’s homeowner don’ts include: don’t dust, sweep, or vacuum debris that may contain asbestos; don’t saw, sand, scrape, or drill holes in asbestos-containing materials; and don’t use abrasive pads or a power stripper on flooring that may contain asbestos.
Need testing in South Carolina? Tell us your ZIP and test type and we will match you with a licensed asbestos professional.
Get Matched With a Licensed Tester — FreeSouth Carolina asbestos testing FAQ
Do I need SCDES notice to demolish a commercial building with no asbestos?
Yes. SCDES requires an ePermitting demolition application at least 10 working days ahead even if the inspector finds no asbestos, plus the inspector’s report and a Department permit. Source: SCDES.
Who can inspect for asbestos in South Carolina?
A SCDES-licensed building inspector (consultant/building inspector license). Source: SCDES licensing.
Who does air monitoring on South Carolina abatement jobs?
A SCDES-licensed air sampler implements air monitoring plans during abatement and is often the building owner’s representative. Source: SCDES licensing.
Every fact above is taken from official state, city/county, or EPA pages fetched for this site (last checked November 2026). If a detail could not be verified, it was left out.
Testing guides
South Carolina’s licensed air sampler role is the natural home for project air and clearance sampling — see our air-testing and clearance guides.